Kirkstone Park to Salop Trail cycling route

We're working to connect the Lynn Valley and Lynn Creek town centres with a continuous cycling route of multi-use paths and neighbourhood bike pathways through the District.

Once completed, the Lynn Valley Town Centre to Lynn Creek Town Centre Cycling Route will provide a safe and convenient, well-lit corridor that will help encourage people to cycle to the town centres.

Project scope


Click here to view the accessible version of this interactive content

The project's scope includes a multi-use path (MUP) passing through Kirkstone Park, improvements to the Kirkstone Road and Rufus Drive intersection, neighbourhood bikeways along Rufus Drive, Brooksbank Avenue and Cloverley Street and a multi-use path along a section of Salop trail, from Cloverley Street to Shavington Street.

This project also includes wayfinding signage for users to navigate to key destinations along the route.

Currently out of scope for this project but planned for the future are the segments located within the boundary of the City of North Vancouver and around Brooksbank Elementary.

Project details  

Kirkstone Park segment (MUP), Kirkstone Road/Rufus Drive intersection 

  • a paved multi-use path
  • wayfinding signage and road markings
  • upgraded existing lighting fixtures to LED lighting and additional pathway lighting where needed
  • improvements to the Kirkstone Road and Rufus Drive intersection to accommodate a cycling crossing
  • fencing on the south end to protect the stream

Rufus, Brooksbank, Cloverley segments (neighbourhood bikeways)

  • traffic-calming measures as required
  • wayfinding signage
  • pavement markings along the route

Salop Trail, from Cloverley Street cul-de-sac to Shavington Street cul-de-sac (MUP)

  • a paved multi-use path
  • wayfinding signage and road markings
  • new LED lighting infrastructure
  • remediation of the Salop trail segment from invasive plant species
  • may require a few tree removals (depending on the chosen option)

 

News and updates

June 2023 — Project status

The Kirkstone Park to Salop Trail cycling route is currently under staff review and is expected to be constructed in 2024.

May 24, 2022 — Community engagement 

Thank you for sharing your thoughts about the Kirkstone Park to Salop Trail section of this route. Your input will help us finalize designs for each of the segments. Results of the community engagement will be posted once finalized. 

April 28, 2022 — Community survey  

We are asking for your thoughts about the Kirkstone Park to Salop Trail section of this route to help guide our design for the entire cycling route. 

The online engagement survey will run until May 24, 2022. 

Background

In 2017, Council identified the Lynn Valley Town Centre to Lynn Creek Town Centre Cycling Route as a priority route. Council later reconfirmed the route as a priority at a workshop in 2021.

Completion of the Lynn Valley to Lynn Creek Town Centre Cycling Route will provide a continuous, safe corridor for cyclists. In addition, pedestrian and cyclist visibility will be improved with additional lighting and the replacement of old light fixtures with LED lights where possible to reduce maintenance and energy costs.